AADHI KALKI CRANE SERVICES
Heavy Lift Division • Telemetry & Digital Logsheet (PNM WP13 R01)
🚜 + Deploy Machine
⚙️ Admin
← Website
📖 Guide
● Live Sync
✓ Shift Log Verified & Locked
Log Another Shift
L&T Site In-Charge Verification
Format: L&T Heavy Civil Infrastructure (PNM WP13 R01)
Pending Sign-Off
Equipment on Site
—
Client & Work Order
—
Shift & Date
—
Commenced — Completed
—
HMR Commenced → Completed
—
Total Engine Run Time
—
Operator on Seat
—
Overtime Hours
—
Work Done (Production Details)
—
User Name
(L&T Engineer / In-Charge)
User Mobile / Plant & Machinery Dept
User Signature
(L&T Supervisor Sign on Glass)
Sign with finger or stylus
Clear Signature
✓ Approve & Lock Shift
Select Active Machine / Deployment
🚜
+ Deploy New Machine
Loading deployed cranes...
Loading Deployment...
Work Order:
—
ACTIVE
Client & Project Site
—
Asset / Vehicle Registration #
—
Assigned Operator
—
Contract Shift & Overtime
8.0 hrs/shift • ₹1,200/hr OT
1. Shift Timing & Identification
Format: L&T Construction Heavy Civil Infrastructure (PNM WP13 R01)
Today
Shift Date
Log Sheet Slip No.
(Book Serial #)
Shift Type
Day Shift (12h: 08:00 AM – 08:00 PM)
Night Shift (12h: 08:00 PM – 08:00 AM)
24-Hour Continuous
Commenced Time
Completed Time
Operator On Seat
Operator Mobile
2. Hour Meter Reading (HMR)
Syncing...
Start HMR
(Previous Closing)
End HMR
(Shift Closing)
Total Machine Engine Run
(End HMR – Start HMR)
0.0
HRS
Hours Operational Split
● Productive (Work)
● Client Idle / Standby
● Breakdown / Repair
⚠️ Hours mismatch: Productive + Idle + Breakdown must equal Total Run Hours.
⚡ Overtime Triggered:
0.0
hrs billable at agreed OT tariff.
3. Production Details & Fuel
Activity Code
(L&T ERP Code / Category)
Diesel Added
(Liters)
Work Done
(Production Details as logged in L&T Sheet)
4. User Information & Approval
L&T Site Supervisor / In-Charge Verification
Mandatory
User Name
(Site Engineer / Supervisor)
User Mobile / Plant & Machinery Dept
User Signature
(L&T Site Supervisor Touch Sign-Off on Glass)
Draw signature above with finger or stylus
Clear Signature
✓ Save & Lock Daily Log
Recent Shift Logs for this Unit
0 Logs
Date
Shift
Run Hrs
OT
Sign-off
Status
Loading logs...